This is one project that I've done from head to toe, till now ie :). Actually this project was already behind schedule when I arrived at the office, wasn't told to do it even after a good 1 and half months :D, and then was told to finish in a week :D.
This is an animation project for the outer ring road, we were supposed to make 10 - 15 minute animation of the different features of the Outer Ring Road. Being a civil engineer myself I was very enthusiastic about the project and spent many sleepless nights on it :D.
Making animation is not an easy task, especially due to the time it consumes to render, a 10 second animation can easily take 4-5 hours even on the best pc around :). I actually had to buy a new computer just for this animation :D. So instead of making all animations, I made few detailed stills, panned and zoomed around it for some time, and then the animations followed :).
Here are some of the images

Quite wide roads naah :D, 50m total

Total width
Half width (almost 6 lanes :D)
Tunnel was fun to make :D
Flyover scrambled in one night :D

Flyover turned out best though


The total animation is a good 12 minutes long, and was made in flash. Its not an easy task I tell you, I hadn't realized that at first and left only a day for flash, how wrong I turned out to be :D. It took 3 days. In all I was quite satisfied, the people from outer ringroad were quite impressed too, but I was quite alarmed by the reaction from the people from Bhawan Bibhag :( :). I don't care if their project is astray, is it too futuristic??, the buildings n all, I think it is possible in 10-15 yrs, actually we are already seeing quite many such buildings in the valley.